Appalachian Underground Corrosion Short Course
Register button Online Grades button
Maps and directions button NACE button
FAQ button Full Course button


COURSE DOWNLOADS

All content on the Appalachian Underground Corrosion Short Course (AUCSC) web site is protected by copyright of AUCSC and may not be reproduced, duplicated or distributed without the express written permission of AUCSC. The Fundamentals, Basic, Intermediate and Advanced textbooks may be reproduced only as single copies for study and review only by an individual solely for his or her own use who personally and directly downloads the document from the AUCSC website.


FBIA TEXTBOOKS

Fundamentals

Basic

Intermediate

Advanced


Speaker Presentations 2016 PDF Files


COATINGS

Coatings Period 1 AUCSC 2016 - Fundamentals of Pipeline Coatings

Coatings Period 2 AUCSC 2016 - Coatings Failure Case Histories (2)

Coatings Period 3 AUCSC 2016 - Application of Heat Shrink Sleeves

Coatings Period 7 AUCSC 2016 - Critical Application & Steps for 2 Part Epoxies

Coatings Period 8 AUCSC 2016 - Coating Selection for Underground Service

Coatings Period 9 AUCSC 2016 - Evaluation & Selection of Directional Drill Pipe Coatings

Coatings Periods 10 & 11 AUCSC 2016 - QC Inspection and Instrumentation for Paint and Coating Installations


INTERMEDIATE 2016

Intermediate-1-Corrosion Cells In Action.ppt

Intermediate-10-11-Troubleshooting CP Systems.ppt

Intermediate-12-Rectifier Maintenance.pptx

Intermediate-2-Installation of GalvAnodes.ppt

Intermediate-3-Installation of Impressed Current System 2014

Intermediate-4-5 - Criteria for cathodic protection

Intermediate-6- Corrosion Control for Pipelines.pdf

Installation of piplelines for Corrosion control


PIPELINE INTEGRITY

2016 AUCSC PIM - Period 1 - Pipeline Integrity Regulations & Standards - LReynolds

PIM - Period 6 - In-Line Inspection Methods Tools

PIM Period 4 and 5 - ACVG CA and DCVG

Pipeline Integrity Mgmt - 12-13 PHMSA Perspective.pdf


TECHNOLOGY TODAY

TT01 - In-Line Inspection Data Interpretation 2016 0517 FINAL - NO PICS

TT04 - Planning & Executing a Pipeline Remediation Program 2016 0517 FINAL - NO PICS

TT06 - AC Corrosion Issues - 2016 - AUCSC

TT07 - AUCSC 2016 Lightning and overvoltage protection

TT08 - AUCSC 2016 Decoupler interaction with CIS

TT11 - Modern DA indirect tools JWs 2016 AUCSC

TT12 - AUCSC CP for AST's Presentation

TT13 - Cathodic Protection Current Measurement

TT14 - Anodic Stray Current Interference.pdf


WATER AND WASTEWATER

AUCSC CP Applications for Water and WW tanks JTL

AUCSC Water Loss Prevention Thru Corrosion Control Advancements May 2015.pdf


Speaker Presentations 2015 PDF Files


TECHNOLOGY TODAY

TT01 - In-Line Inspection Data Interpretation 2015 0519 FINAL - NO PICS.pdf

TT02 - Pipeline Repair 2015.pdf

TT04 - Planning & Executing a Pipeline Remediation Program 2015 0519 FINAL - NO PICS.pdf

TT07 - Lightning and overvoltage protection 2015.pdf

TT08 - Decoupler interaction with CIS 2015.pdf

TT09 - CONDUCTING CLOSE INTERVAL POTENTIAL SURVEYS 2015.pdf

TT10 - Corrosion Control in M&R Stations 2015.pdf

TT11 - SCM Modern Approaches to Interference testing 2015.pdf

TT12 - CP for ASTs 2015.pdf

TT13 - Cathodic Protection Current Measurement 2015.pdf

TT14 - 3D Structured Light C2015-5528 rev1.pdf


Speaker Presentations 2014 PDF Files


COATINGS

Coatings Period 1 AUCSC 2014 - Fundamentals of Pipeline Coatings.pdf

Coatings Period 2 AUCSC 2014 - Coatings Failure Case Histories.pdf

Coatings Period 4 AUCSC 2014 - Field Coating with Shrinkable Sleeves.pdf

Coatings Period 9 AUCSC 2014 - Evaluation and Selection of Directional Drill Coating.pdf

Coatings Periods 10 & 11 AUCSC 2014 - Quality Control Inspection and Instrumentation for Paint and Coating Installations.pdf

 

PIPELINE INTEGRITY MANAGEMENT

Pipeline Integrity Management Period 8 - Atmospheric Corrosion Integrity Management.pdf

 

TECHNOLOGY TODAY

TT01 - In-Line Inspection Data Interpretation 2014 0512.pdf

TT02 - Point 2014 Pipeline Repair Presentation.pdf

TT03 - Foreign Contacts and Pipe Fault Surveys.pdf

TT04 - Planning & Executing a Pipeline Remediation Program 2014 0513.pdf

TT05 - Todays ILI 2014.pdf

TT06 - AC Corrosion Issues - 2014.pdf

TT07 - 2014 Lightning and overvoltage protection.pdf

TT08 - 2014 Decoupler interaction with CIS.pdf

TT09 - Conducting Close Interval Potential Surveys 5-5-2014.pdf

TT13 - 2014 CPCM Signal Intepretation.pdf

TT14 - 3D Structured Light Presentation May 2014 jp.pdf

 

WATER AND WASTEWATER

WW1- Understanding the Basics of Corrosion and Corrosion Control - Copy.pdf

WW1 Corrosion and CP for Water Mains 2014.pdf

WW3 How to Provide Indefinite Life for WTP - AUCSC Pipeline 2014 RSB V.ppt [Compatibility Mode].pdf

WW4 Economics of Cathodic Protection for Water Pipelines 2014.pdf

WW5 Electric Rail Corrosion 2014.pdf

WW6 Corrosion Control in Water Storage Tank 2014.pdf

WW7 Installation of Cathodic Protection Systems in Water Towers 2014.pdf

WW8 Above Ground Coatings including Maintenance 2014.pdf

WW9 Coating Protection 2014 .pdf

WW10 11 Corrosion Failures 2014 .pdf

 


Speaker Presentations 2013 PDF Files


BASIC

2013 Update Record Keeping Basic Chapter 8 Period 12-TLC.ppt

 

COATINGS

Coatings Period 1 AUCSC 2013 - Fundamentals of Pipeline Coatings.pdf
Coatings Period 2 AUCSC Luke Clark.pdf
Coatings Period 10 AUCSC Bill Corbett.pdf
Coatings Period 11 AUCSC 2013 - Troy Fraebel_1.pdf

 

FUNDAMENTALS

Fundamentals Period 7 AUCSC 2013 - Introduction to Pipeline Coatings.pdf

 

INTERMEDIATE

2013 Update Installation of GalvAnodes Intermediate Chap2 Period 2-TLC.ppt
AUCSC Period 12 Rectifier Maintenance 2013 MT.pptx

 

SYSTEM DIAGNOSTICS

Troubleshooting Distribution Systems for AUCSC 052213.pdf

 

WATER/WASTEWATER

Troubleshooting Distribution Systems for AUCSC 052213.pdf

 


Speaker Presentations 2012 PDF Files

Coatings - 1 Fundamentals of Pipeline Coatings

Coatings - 2 QA QC Coating Inspection and Instrumentation

Coatings - 3 Field Coating with Shrinkable Sleeves

Coatings - 9 HDD

Coatings - 11 Failure Modes of Buried Pipeline Coatings

Fundamentals Period 7 - Intro to Pipeline Coatings

Intermediate - Chapter 8

Pipeline Integrity Mgt. Period 2 - Data Integration

Pipeline Integrity Mgt. Period 6 - In-Line Inspection Standards Methods Tools

Pipeline Integrity Mgt. Period 8 - Atmospheric Corrosion Integrity Mgt.

Pipeline Integrity Mgt. Periods 9 & 10 - Difficulty to Dig Pipelines

Pipeline Integrity Mgt. Periods 4 & 5 - Indirect Inspection Tools ACVG CA and DCVG

Pipeline Integrity Mgt. Periods 4 & 5 - Indirect Inspection Tools

Technology Today 01 - SC2012 In-Line Inspection Data Interpretation NOPICS

Technology Today 2 - Pipeline Repair Methods

Technology Today 3 - Foreign Contacts and Pipe Fault Survey

Technology Today 4 - Planning Pipeline Remediation Program

Technology Today 6 - AC Corrosion Issues

Technology Today 7 - Instant Off Measurements

Technology Today 8 - Overvoltage Protection

Technology Today 9 - Close Interval Surveys

Technology Today 11 - Modern DA Tools

Technology Today 12 - AC Interference

Technology Today 13 - CP Interference

Technology Today 14 - New Technology

Water & Wastewater - 2 Coatings 101-2012

Water & Wastewater - 4 Corrosion Control of DIP- Consultants Perspective

Water & Wastewater - 6 Corrosion Control Monitoring

Water & Wastewater - 11 Corrosion Prevention of Steel Pipes 2012

Water and Wastewater Program Flyer2011.pdf

Back to Top